Installs & bring-up
BTS and baseband commissioning. Module installs, hardware bring-up. LTE and 5G NR.
Four categories. Detailed scope happens in conversation.
BTS and baseband commissioning. Module installs, hardware bring-up. LTE and 5G NR.
Fiber and SFP validation. Call testing, sector validation, site acceptance.
Radio config (AEHC, AHLOA, AHFIG), RET, GPS sync, switch config, software updates.
VSWR and RTWP analysis, alarm clearing, backhaul verification, prior-sub rework.
Built in-house. Live status on every site, plus scheduling — without chasing us down.
Client portal
Self-serve
Log in for live status on every active site. No status calls.
Scheduling
Built-in
Confirm and adjust dates in the portal. No call threads.
Visibility
Live
Progress and closeout surface as they happen. No carrier-side surprises.
Not billed separately. Not gated behind a pilot. It’s how the work gets done.
Posted, not quoted.
$900 / day
$1,500 flat
Priced per site.
Regional telecom operator. Same muscle that runs the portal.
Labor hours saved annually
Annual savings, integrator labor only
Reduced update failures
Saved per integration
Milestone timestamping on every integration. Software updates dominated the on-site clock.
Second laptop per integrator. Cut ~45 min of waste per site.
Read console signatures. Abort in 3-5 min instead of burning a 20-min cycle. Failure rate −19%.
Stage and bulk-update in the warehouse. Modules arrive pre-configured. The biggest lever.
Operational insight plus hands-on work. The same instinct we bring to every site.
LTE and 5G expansion work — Sprint conversion, T-Mobile expansion, Nokia AirScale across both.
Nokia AirScale sites integrated
Deployments green-lit
First-time pass